Marko S
Muita ideoita: Marko
Panzerkampfwagen VI Tiger

Panzerkampfwagen VI Tiger

Tiger 1. Russia. 1944.

Tiger 1. Russia. 1944.

Tiger I in northern France, March 1944.

Tiger I in northern France, March 1944.

One Tiger tank cost the same number of skilled man hours to produce as two Panther tanks or three Messerschmit 109 fighters, and at 57 English tonnes overall weight it required 2.75 gallons of gasoline to drive one mile.   Tiger tanks were frequently destroyed in combat by the use of heavy artillery to pentrate the thin upper deck and turret top, or the tanks had to be ambushed and shot in the sides or rear at very close range. All 1,355 Tigers were built, within two years (1942 to 1944).

One Tiger tank cost the same number of skilled man hours to produce as two Panther tanks or three Messerschmit 109 fighters, and at 57 English tonnes overall weight it required 2.75 gallons of gasoline to drive one mile. Tiger tanks were frequently destroyed in combat by the use of heavy artillery to pentrate the thin upper deck and turret top, or the tanks had to be ambushed and shot in the sides or rear at very close range. All 1,355 Tigers were built, within two years (1942 to 1944).

adlerangriff: “Wehrmacht soldiers on Tiger tanks ”

adlerangriff: “Wehrmacht soldiers on Tiger tanks ”

painting+SS+uniforms.jpg 567×860 pikseliä

painting+SS+uniforms.jpg 567×860 pikseliä

MesserschmittBf 109G-6 ,I./JG 52, Ebenrode 1944

MesserschmittBf 109G-6 ,I./JG 52, Ebenrode 1944

Bachem Ba 349 "Natter"

Bachem Ba 349 "Natter"

The U-101 was a Type VIIB U-boat of German Kriegsmarine during World War II. She was laid down on 31 March 1939 at Germaniawerft, Kiel, as 'Werk 595', launched on 13 January 1940 and commissioned under her first commander Kapitänleutnant Fritz Frauenheim on 23 September of that year. Frauenheim commanded her for her work-up with the 7th U-boat Flotilla between 11 March and 18 November 1940

The U-101 was a Type VIIB U-boat of German Kriegsmarine during World War II. She was laid down on 31 March 1939 at Germaniawerft, Kiel, as 'Werk 595', launched on 13 January 1940 and commissioned under her first commander Kapitänleutnant Fritz Frauenheim on 23 September of that year. Frauenheim commanded her for her work-up with the 7th U-boat Flotilla between 11 March and 18 November 1940