Villa K+S

House for our small family. We bought this house in September 2014. From September to February we start planing process and i February we start building process. The first part is to reinvent and strengthen the main house based on our ideas and needs.
27 Pin-lisäykset35 Seuraajat
Tulikivi vasa fireplace almost ready.

Tulikivi vasa fireplace almost ready.

House drawing when build in 1968.

House drawing when build in 1968.

Planing next step after existing walls is removed.

Planing next step after existing walls is removed.

House interior September 2014.

House interior September 2014.

Model for  soapstone oven made. Important to test before decisions are made.

Model for soapstone oven made. Important to test before decisions are made.

Wall and ceiling ready for insulation.

Wall and ceiling ready for insulation.

Insulation made in Finland from linen with ability to buffer moist. Good for indoor and global environment.

Insulation made in Finland from linen with ability to buffer moist. Good for indoor and global environment.

Window wall is rebuild and on extra window is in place. We love the view.

Window wall is rebuild and on extra window is in place. We love the view.

Making foundation for soapstone oven out of concrete and local stones from the Barents sea coastline.

Making foundation for soapstone oven out of concrete and local stones from the Barents sea coastline.

Walls of Nordic spruce and ceiling of Nordic pine.

Walls of Nordic spruce and ceiling of Nordic pine.

Pinterest
Haku